Case

Location:

Public construction project on the north bank of Daxi River in Yixing

工程描述

The public construction project on the north bank of Daxi River was undertaken by our company. It is the first fully assembled frame structure building in my country with a construction area of ​​2,535 square meters. It adopts a prefabricated concrete frame structure system to achieve full prefabrication of pile foundations, pedestals, columns, beams, floor slabs, wall panels, and balcony panels. It represents the high level of fully assembled frame structure construction in my country. While optimizing the performance and function of the building, the project also improves the structural safety. This technology is also called “revolutionary energy-saving technology” by the industry. In the future, the company’s fully assembled frame structure construction technology will bring a revolution to traditional Chinese architecture. It is a milestone in China’s low-carbon buildings and will soon be widely promoted and used by the country.